The Scope Creep dictionary

The Scope Creep dictionary

Every profession has it's own language, and project management's is unusual in one respect: almost none of it means what it says. This isn't dishonesty, exactly. It's compression. Direct speech is expensive in meetings, so the profession evolved a set of phrases that let everyone acknowledge a problem without anyone having to own it out loud. Learning the job is partly learning this language, and nobody hands you the dictionary.

So here it is. Terms collected across agencies, in-house teams and hospitality tech, translated with the affection of someone who has said every single one of them.

Quick sync A meeting with no agenda, no end time, and at least one piece of news you won't enjoy. The word "quick" is doing the work a trigger warning should. What to do: ask "anything I should look at beforehand?" This converts roughly half of all quick syncs into a Slack message, which is what they were all along.

Slight risk to the timeline The timeline is dead. The speaker knows the timeline is dead. This phrase is the timeline being placed gently into a hospice, with visiting hours, so that stakeholders can say goodbye at their own pace. What to do: thank them for the flag, then ask what date they'd bet their own money on.

We're tracking towards the deadline Note the physics: tracking towards, the way an asteroid tracks towards a planet. This phrase contains no claim about arrival. It's the single most load-bearing phrase in delivery, and its genius is that it's technically true from any distance.

Let's take that offline Either "this is derailing the meeting and I'm saving us all", which is noble, or "I have no answer and am buying time", which is human. Tell them apart by whether the offline conversation ever occurs. What to do if you said it: put the follow-up in the calendar before the meeting ends, while your credibility is still warm.

Just to play devil's advocate The speaker fully holds this opinion and has dressed it as a hypothetical so it can be disowned if the room turns. The devil has plenty of advocates; opinions with a safety catch, fewer.

MVP Originally: the smallest thing that tests the idea. Currently: the entire original scope, but said in a tone that implies restraint. If your MVP takes four months, one of those letters is lying, and it's usually the M.

Phase 2 The graveyard where features go while their families are told they've gone to live on a farm. Every Phase 2 is announced sincerely and staffed never. What to do: if you actually intend to build it, give it a date before the meeting ends. A Phase 2 with no date is a "no" wearing a lanyard.

Soft deadline A deadline the speaker has already decided you'll miss, disclosed in advance so their disappointment can be managed rather than experienced. There is no such thing as a soft deadline; there are deadlines, and there are dates.

We should socialise this "I need to find out who will be angry, before they find out in a room with witnesses." Genuinely one of the most useful activities in the building, hidden inside the most cringeworthy verb in the building.

As per my last email The Geneva Convention permits this phrase only once per conflict. It means: I have written proof, I am now displaying the proof, and I want you to know that I know that you know. What to do when you receive it: capitulate immediately. You've already lost, and there's dignity in speed.

Do you have capacity? The work is coming regardless. This question isn't a question, it's a receipt being printed. What to do: never answer with yes or no. Answer with a trade: "For when? Here's what's currently on the plate, tell me what moves." Capacity isn't a boolean, it's a queue, and people who answer with the queue get buried measurably less often.

Happy to be overruled The speaker is not happy to be overruled. The speaker is documenting, in front of witnesses, that the coming disaster was somebody else's decision. This is the sound of a person laminating their objection. Respect it; you're hearing the retro being written three months early.

It is what it is The white flag of delivery. All translation ends here. The phrase means the situation is beyond both repair and useful analysis, and the speaker has moved to the acceptance stage of grief on behalf of the entire project. Buy them a coffee. They've been carrying something.

Why the dictionary exists

It's tempting to read all this as an indictment, a profession that can't say what it means. I read it the other way. Every entry above is a pressure valve: a way of surfacing bad news, claiming territory, or admitting defeat without anyone losing face in a room full of colleagues. The phrases survive because they work. Face, it turns out, is a project dependency like any other.

But here's the actual job, and it took me years to see it plainly: a project manager is a translator. The organisation speaks in the language above; the project needs the plain version, the one with dates and numbers and owners. Your value is moving between the two without breaking either. Hear "slight risk to the timeline" and record "three weeks late". Say "let's take that offline" and then actually take it offline. Speak dictionary in the room, and truth in the plan.

And if you've read this far and recognised your own most-used entry: mine's "we're tracking...". Still. Some asteroids never land.